Platinum Track Services Logo
Platinum Track Services Logo
Projects/METROLINX – Toronto (GTA), Ontario
ROWCrossingsInspections

METROLINX – Toronto (GTA), Ontario

Various contracts throughout the Metrolinx system. ROW maintenance program, State of Good Repair, and rail program for 2023, 2024, and 2025.

Scope

  • Crossing rehabilitation (local paving contractor for all crossings).
  • Rail replacement.
  • Tie replacement.
  • Anti Trespass pads.
  • Fencing installation (local fencing contractor).
  • Track protection.
  • EFB welding.
  • Track undercutting.
  • Track inspections.
  • Equipment rental.

Delivery

Work programs accomplished during daily down periods of operations or planned weekend 72-hour shutdown schedules. Road closures arranged by Platinum Track with various jurisdictions across the Metrolinx network.

Outcome

All work programs completed on time and within budgeted values.

Project StatusCompleted

Value

$11M

Years

2023–2025

Region

GTA

Project Date

September 18, 2024

METROLINX – Toronto (GTA), Ontario
METROLINX – Toronto (GTA), Ontario
METROLINX – Toronto (GTA), Ontario